Equipment Schedule
The Equipment Schedule report lists all HVAC equipment in your project with specifications and performance data.
Central Equipment
Section titled “Central Equipment”Air Handling Units
Section titled “Air Handling Units”For each AHU:
- Model number
- Cooling capacity (total and sensible)
- Heating capacity
- Supply airflow
- External static pressure
- Electrical data
Rooftop Units
Section titled “Rooftop Units”For each RTU:
- Model number
- Cooling capacity
- Heating capacity
- Airflow
- Gas input (if applicable)
- Electrical requirements
Other Central Equipment
Section titled “Other Central Equipment”- Make-up air units
- Exhaust fans
- Energy recovery units
Terminal Equipment
Section titled “Terminal Equipment”VAV Boxes
Section titled “VAV Boxes”For each VAV terminal:
- Zone served
- Model number
- Maximum airflow
- Minimum airflow
- Reheat capacity (if applicable)
- Inlet size
Fan Coil Units
Section titled “Fan Coil Units”For each FCU:
- Zone served
- Model number
- Cooling capacity
- Heating capacity
- Airflow
- Electrical data
Air Distribution
Section titled “Air Distribution”Supply Diffusers
Section titled “Supply Diffusers”For each register:
- Location
- Type and model
- Size
- CFM rating
- Throw
Return Grilles
Section titled “Return Grilles”For each return:
- Location
- Type and model
- Size
- CFM capacity
Schedule Format
Section titled “Schedule Format”Tabular View
Section titled “Tabular View”Equipment organized in tables:
- Sortable by any column
- Expandable for details
- Grouped by equipment type
Equipment Tags
Section titled “Equipment Tags”Unique identifiers:
- AHU-1, AHU-2, etc.
- FCU-101, FCU-102, etc.
- Consistent with drawings
Export Options
Section titled “Export Options”PDF Schedule
Section titled “PDF Schedule”Print-ready equipment schedule:
- Professional formatting
- All specifications
- Ready for bid documents
CSV Export
Section titled “CSV Export”Spreadsheet format for:
- Editing and annotation
- Cost estimation
- Procurement lists
Verification
Section titled “Verification”Check equipment schedules for:
-
Complete coverage
- All zones have terminals
- All systems have equipment
-
Correct sizing
- Capacity meets loads
- Airflow meets requirements
-
Consistent data
- Voltages match available power
- Model numbers are valid
-
Proper coordination
- Terminal sizes match duct
- Capacities match central equipment